Commit graph

2 commits

Author SHA1 Message Date
frankbria
3b4f5f049d docs: archive historical milestone documentation (Oct 2025)
Move completed milestone documentation to docs/archive/2025-10-milestones/ to keep
base directory focused on active development needs:

Archived files:
- PHASE1_COMPLETION.md (response analyzer & circuit breaker milestone)
- PHASE2_COMPLETION.md (requirements & testing enhancements milestone)
- EXPERT_PANEL_REVIEW.md (historical expert review)
- TEST_IMPLEMENTATION_SUMMARY.md (historical test summary)
- USE_CASES.md (historical use case documentation)
- STATUS.md (superseded by IMPLEMENTATION_STATUS.md)

Remaining active docs in base directory:
- IMPLEMENTATION_PLAN.md (roadmap for Weeks 3-6)
- IMPLEMENTATION_STATUS.md (current status tracking)
- README.md (project documentation)
- CLAUDE.md (agent instructions)
- SPECIFICATION_WORKSHOP.md (reusable template)
- sample-prd.md (example template)

Added docs/archive/2025-10-milestones/README.md explaining archive contents
and historical context.
2025-12-31 17:17:34 -07:00
frankbria
d215d96e60 docs: Add expert panel review and recommendations
Comprehensive analysis from 9 software engineering experts identifying:

**Critical Issues (Phase 1 - NOW IMPLEMENTED )**:
- Missing response analysis pipeline
- No circuit breaker for stagnation detection
- Lack of structured output contract

**High Priority (Phase 2 - Next)**:
- Requirements improvement with SMART criteria
- Use case documentation
- Enhanced integration test coverage

**Operational Excellence (Phase 3 - Future)**:
- Metrics and observability
- Health checks and monitoring

This review drove the Phase 1 implementation completed in previous commit.

🤖 Generated with [Claude Code](https://claude.com/claude-code)

Co-Authored-By: Claude <noreply@anthropic.com>
2025-10-01 21:11:28 -07:00