frankbria
|
d215d96e60
|
docs: Add expert panel review and recommendations
Comprehensive analysis from 9 software engineering experts identifying:
**Critical Issues (Phase 1 - NOW IMPLEMENTED ✅)**:
- Missing response analysis pipeline
- No circuit breaker for stagnation detection
- Lack of structured output contract
**High Priority (Phase 2 - Next)**:
- Requirements improvement with SMART criteria
- Use case documentation
- Enhanced integration test coverage
**Operational Excellence (Phase 3 - Future)**:
- Metrics and observability
- Health checks and monitoring
This review drove the Phase 1 implementation completed in previous commit.
🤖 Generated with [Claude Code](https://claude.com/claude-code)
Co-Authored-By: Claude <noreply@anthropic.com>
|
2025-10-01 21:11:28 -07:00 |
|