Commit graph

1 commit

Author SHA1 Message Date
frankbria
d215d96e60 docs: Add expert panel review and recommendations
Comprehensive analysis from 9 software engineering experts identifying:

**Critical Issues (Phase 1 - NOW IMPLEMENTED )**:
- Missing response analysis pipeline
- No circuit breaker for stagnation detection
- Lack of structured output contract

**High Priority (Phase 2 - Next)**:
- Requirements improvement with SMART criteria
- Use case documentation
- Enhanced integration test coverage

**Operational Excellence (Phase 3 - Future)**:
- Metrics and observability
- Health checks and monitoring

This review drove the Phase 1 implementation completed in previous commit.

🤖 Generated with [Claude Code](https://claude.com/claude-code)

Co-Authored-By: Claude <noreply@anthropic.com>
2025-10-01 21:11:28 -07:00