Commit graph

2 commits

Author SHA1 Message Date
frankbria
d9960e4683 docs: synchronize implementation documentation with codebase (2025-12-31)
Update all base directory documentation to accurately reflect current codebase state:

- IMPLEMENTATION_PLAN.md: Correct CI/CD status (operational), update test counts (75 actual),
  clarify week completion status (1-2 + partial 5 complete)
- IMPLEMENTATION_STATUS.md: Add verification dates, detailed test breakdowns, updated remaining
  work estimates, recent improvements section
- STATUS.md: Update from 35 to 75 tests, add integration test details, include lib/ modules
- PHASE1_COMPLETION.md & PHASE2_COMPLETION.md: Add historical milestone notes

Key corrections:
- CI/CD pipeline IS operational (.github/workflows/test.yml)
- install.sh DOES copy lib/ directory (verified lines 78, 91, 148)
- 75 tests accurately reported (15 rate + 20 exit + 20 loop + 20 edge)
- Week 5 partially complete (edge cases done, features not implemented)
- Weeks 3-4 and 6 not started (accurate status vs. optimistic claims)

All documentation now synchronized with codebase as of 2025-12-31.
2025-12-31 17:14:09 -07:00
frankbria
33c5b00822 docs: Phase 2 completion summary and metrics
Comprehensive documentation of Phase 2 achievements:

- Requirements enhancement with SMART criteria
- Use case documentation (Cockburn methodology)
- Edge case test coverage (20 new tests)
- Specification workshop framework
- Before/after comparison with Phase 1

Key metrics:
- 1,640 lines of documentation and tests
- 40/40 integration tests passing (100%)
- 6 concrete Given/When/Then exit scenarios
- 6 fully documented use cases
- Complete workshop framework for future features

All Phase 2 high-priority expert recommendations implemented.

🤖 Generated with [Claude Code](https://claude.com/claude-code)

Co-Authored-By: Claude <noreply@anthropic.com>
2025-10-01 21:36:36 -07:00