Commit graph

1 commit

Author SHA1 Message Date
frankbria
33c5b00822 docs: Phase 2 completion summary and metrics
Comprehensive documentation of Phase 2 achievements:

- Requirements enhancement with SMART criteria
- Use case documentation (Cockburn methodology)
- Edge case test coverage (20 new tests)
- Specification workshop framework
- Before/after comparison with Phase 1

Key metrics:
- 1,640 lines of documentation and tests
- 40/40 integration tests passing (100%)
- 6 concrete Given/When/Then exit scenarios
- 6 fully documented use cases
- Complete workshop framework for future features

All Phase 2 high-priority expert recommendations implemented.

🤖 Generated with [Claude Code](https://claude.com/claude-code)

Co-Authored-By: Claude <noreply@anthropic.com>
2025-10-01 21:36:36 -07:00